Infrastructure
Data/information
Energy
Facilities management
Industrial infrastructure/mining
Institutional development
Rail
Rural development
Solid waste
Transportation
Urban development
Wastewater
Water
Watershed management
 Environment
 Buildings
 Clients

   Global > Services > Infrastructure > Transportation > Projects

Wandersmann North Tunnel

Two single track tunnels for the new high-speed railway track Köln-Rhein/Main (Deutsche Bahn AG) will run under the Autobahn 3 near Wallau.

Both tunnel portals will be open cut constructions, the tunnel between them of the closed coverage type. The tunnel tube on the Köln-Wiesbaden track has a length of about 800 m, the Wiesbaden-Köln tunnel of about 992 m.

ARCADIS services:

  • Check of final design and execution
  • Check of measurement program (leveling, extensometer and inklinometer measurements)
 


 

Projects